Hastings Local Plan Pre-Submission Version 2023-2041 (Regulation 19) September 2026

Ends on 12th November 2026 (42 days remaining)

Appendix 2: Housing Trajectory Comment

Table 17: Housing Trajectory

Supply components

2023/24

2024/25

2025/26

2026/27

2027/28

2028/29

2029/30

2030/31

2031/32

2032/33

2033/34

2034/35

2035/36

2036/37

2037/38

2038/39

2039/40

2040/41

Total

Completions

128

402

520

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

1,050

Commitments

166

166

75

10

14

431

Sites Proposed for Allocation

0

56

73

127

109

31

40

25

171

85

189

110

55

30

30

1,131

Small Site Windfall Allowance

45

45

45

45

45

45

45

45

45

45

45

45

45

45

45

675

Total

128

402

520

211

267

193

182

168

76

85

70

216

130

234

155

100

75

75

3,287

Annual Requirement Taking Account of Past Completions

175

178

163

137

131

120

113

107

100

103

105

111

90

80

29

0

0

0

The housing trajectory is updated annually in order to recalculate the five-year housing land supply and inform infrastructure delivery planning. In the five-year period between 2028/29 and 2032/33 not shown in Table 17 above is the potential impact of the demolition of no.2 high-rise residential blocks comprising 192 homes and their replacement with a minimum of 180 new homes as part of the first phase of an expected housing renewal scheme. Because the impact of this expected first phase of the renewal scheme is largely neutral in terms of this five-year supply period, it will be incorporated into the trajectory in further iterations of the trajectory.

For instructions on how to use the system and make comments, please see our help guide.
back to top back to top