Hastings Local Plan Pre-Submission Version 2023-2041 (Regulation 19) September 2026

Ends on 12th November 2026 (42 days remaining)

8. Part five - Monitoring Comment

8.1Monitoring criteria for the local plan.

Thematic Area

Policy link

Indicator

Target / benchmark

Objective

Principal source

Spatial strategy / land

SP1; HA1

Net dwellings completed on previously developed land and greenfield land, number and percentage

Maximise PDL delivery; report annual and cumulative split.

O1, O4

HBC planning monitoring.

Housing delivery

SP2; HA1; allocations

Net additional dwellings completed, annual and cumulative.

At least 2,970 net homes 2023-2041.

O4

HBC planning monitoring.

Affordable housing

SP2; ID1

Net affordable homes completed, by tenure and type.

Maximise annual and cumulative delivery

O4

HBC planning monitoring.

Accessible housing

SC2

Qualifying homes approved and completed to required accessible/adaptable standards and NDSS.

Maximise policy compliance.

O4

HBC planning monitoring.

Self/custom build

H4

Permissions and completions for self-build/custom-build plots compared with register demand.

Sufficient permissions to meet demand.

O4

HBC planning monitoring.

Gypsies and Travellers

SP2; H5; GT allocations

Permanent pitches permitted and completed.

12 permanent pitches by 2041.

O4

HBC planning monitoring.

Employment

SP3; E1; allocations

Net employment floorspace completed and lost.

Net new employment floorspace by 2041; no loss contrary to policy.

O3

HBC planning monitoring.

Skills and local labour

E2; ID1

Qualifying schemes with agreed Local Skills Development Plan/local labour and procurement agreement, and completion statement.

Agreed outputs delivered or explained.

O3, O5

HBC planning monitoring.

Town centres

SP4; E3

Main town-centre-use floorspace permitted/completed within the centre hierarchy; vacancy rate.

100% location-policy compliance.

O3

HBC planning monitoring.

Biodiversity

SP8; SC10

Qualifying permissions and completions achieving required biodiversity net gain, including on-site/off-site split.

100% achieve policy-required percentage.

O1

HBC planning monitoring.

Urban greening

SC13

Major schemes meeting or exceeding the applicable Urban Greening Factor.

100% achieve policy benchmark.

O1, O4

HBC planning monitoring.

Climate mitigation

SP5; SC3

Major schemes with compliant Energy Strategy Report.

100% policy compliance

O1

HBC planning monitoring.

Water efficiency

SC3

New homes and qualifying non-residential development meeting policy water-efficiency standard.

100% policy compliance

O1

HBC planning monitoring.

Coastal change

SP9; SC17

Applications and permissions in the Coastal Change Management Area.

Zero new residential permissions; 100% policy-compliant assessments.

O1

HBC planning monitoring.

Land Stability

SC15; SC18

Schemes on potentially unstable land with required investigation and completed remediation/stability measures.

Number of permission granted within LARA areas.

O1, O4

HBC planning monitoring.

Heritage at risk

SP7; SC5-SC8

Number and condition of heritage assets at risk, including assets removed from/added to registers.

Net reduction in assets at risk.

O3, O4

HBC planning monitoring.

Infrastructure delivery

SP12; ID1; site policies

IDP projects and site-specific infrastructure delivered against programme and occupation triggers.

Infrastructure delivered by required trigger; annual progress on all priority schemes.

O5

Infrastructure Funding Statement and IDP

Developer contributions

ID1

Financial and in-kind obligations secured, received, allocated, spent and overdue

No overdue obligation without action; spend within legal time limits and for specified purpose

O5

Infrastructure Funding Statement