OpusConsult OpusConsult Skip to main content
Login
|
Register
hastings online logo

Hastings Planning Policy Consultations

  • Home
  • Sustainability Appraisal of the Revised Proposed Submission Development Management Plan
  • Appendix C continued - Appraisal of Site Allocations

Sustainability Appraisal of the Revised Proposed Submission Development Management Plan

Ended on the 22 April 2014
  • Non-Technical Summary
    • Context and legislation
    • Sustainability objectives
    • Likely significant effects
    • Mitigation measures
    • Selection of alternatives
    • Monitoring
  • 1.0 Introduction
    • Purpose of this report
    • Sustainability Appraisal background
    • Consultation
  • 2.0 Appraisal Methodology
    • Assessment
    • Considering alternative options
  • 3.0 Stage 1 - Initial Sustainability Assessment
    • About the Revised Submission Development Management Plan
    • The initial assessment
  • 4.0 Stage 2 - Sustainability Appraisal
    • Overall assessment results
    • Cumulative and synergistic effects
  • 5.0 Conclusions
    • Monitoring
  • Appendix A - Compliance with the SEA Directive
  • Appendix B - Sustainability Implications of Changes to the Development Management Plan
  • Appendix C - Appraisal of Significant Changes to the Development Management Plan
  • Appendix C continued - Appraisal of Site Allocations
  • Appendix D - Site Allocations Decision Rules
<< Previous Page || Next Page >>

Appendix C continued - Appraisal of Site Allocations

Appraisal of Site Allocations
<< Previous Page || Next Page >>
For instructions on how to use the system and make comments, please see our help guide.
back to top back to top
hastings footer logo

©2025 Hastings Borough Council

Powered by
OpusConsult OpusConsult
Site map | Accessibility | Privacy | Cookies