Object
Development Management Plan Revised Proposed Submission Version March 2014
Representation ID: 5955
Received: 22/04/2014
Legally compliant? No
Sound? No
Duty to co-operate? No
The outline planning permission on this site predetermines the Inspector's consultation. The outline permission won't be revoked-changes will be done as conditions.
Nature Conservation Strategy Map 1998 shows site as part of green network. In 2004 site allocated for housing without public consultation leading to removal from green network.
The community do not want building in the wood. The open spaces CV01/CV04/CV03 provide valuable ecosystem services in an urban area people have accessible woodland on their doorstep. It has been enjoyed for generations. This is Ghyll woodland and Sussex BAP priority, the stream has water snails.
See attached -
Name: R Price
Submission dated 22.04.14 covering Reps 5941-5964 inclusive