Support
Core Strategy Preferred Approaches
Representation ID: 177
Received: 08/07/2008
Representation Summary:
Sustrans requests attention is paid to access to Pebsham Country Park from the to be built Connect2. The existing bridge at Bridge Way can be upgraded with wheeling ramps to allow cycle access and links to a signalised crossing of the A259 followed by a link past the redundant pavillion into the south side of the park.