Support
Core Strategy Preferred Approaches
Representation ID: 10
Received: 03/06/2008
Representation Summary:
There needs to be a timescale for the planned joint pedestrian/cycle routes to be funded/built and in use. Currently it reads as aspirational.
There should be a greater emphasis on providing access to a clean/safe network of footpaths/ways across the town using and upgrading the present /existing network.
Good pedestrian access should also be a part of any design brief and considered in all planning applications.