Object
Development Management Plan Revised Proposed Submission Version March 2014
Representation ID: 5814
Received: 21/04/2014
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
Representation Summary:
Although not considered in the Greater Hollington area, site FB1 Grove school, is another windfall site with an expected capacity of 240. This site is actually within 400 metres of the Robsack A (GH1) site and should be considered when putting forward any justification to retain Robsack Meadow as a development site.
Full text:
Although not considered in the Greater Hollington area, site FB1 Grove school, is another windfall site with an expected capacity of 240. This site is actually within 400 metres of the Robsack A (GH1) site and should be considered when putting forward any justification to retain Robsack Meadow as a development site.