Inspector's Preliminary Findings on HBC Development Management Plan (ID/9)

Search representations

Results for Sussex Wildlife Trust search

New search New search

Support

Inspector's Preliminary Findings on HBC Development Management Plan (ID/9)

MM1 - deletion of site at Upper Wilting Farm (FB12)

Representation ID: 9675

Received: 27/03/2015

Representation Summary:

The Sussex Wildlife Trust welcomes the removal of site FB12.

Full text:

See attached full submission covering Reps 9675 - 9683 inclusive

Comment

Inspector's Preliminary Findings on HBC Development Management Plan (ID/9)

MM3 - Design

Representation ID: 9676

Received: 27/03/2015

Representation Summary:

Modification welcomed, agree that the figures of indicative capacity should not be absolute. However we would like to see this proposed policy wording strengthened to include reference to the natural assets on the site, not just the views. For example:

'...Of principle and greater consequence for every scheme, however, will be matters which include the design, height, mass and appearance of the proposed building(s), layout (including the provision of a safe and convenient access), trees, biodiversity, green infrastructure and relationship with the surroundings...'

This would help increase the Plan's emphasis on environmental considerations as per paragraph 4 of ID/9.

Full text:

See attached full submission covering Reps 9675 - 9683 inclusive

Support

Inspector's Preliminary Findings on HBC Development Management Plan (ID/9)

MM5 - deletion of proposed allocation of land at Robsack A, Church wood Drive (GH1)

Representation ID: 9677

Received: 27/03/2015

Representation Summary:

We strongly support the removal of allocation GH1 and would support the site's inclusion into the Church and Robsack Wood Local Nature Reserve.

Full text:

See attached full submission covering Reps 9675 - 9683 inclusive

Comment

Inspector's Preliminary Findings on HBC Development Management Plan (ID/9)

MM5 - deletion of proposed allocation of land at Robsack A, Church wood Drive (GH1)

Representation ID: 9678

Received: 27/03/2015

Representation Summary:

Given that this Plan still includes the allocation of four sites for development which are currently designated as Local Wildlife Sites (LWS), we do not believe a LWS designation alone would offer this site sufficient protection from development in the long term.

Full text:

See attached full submission covering Reps 9675 - 9683 inclusive

Comment

Inspector's Preliminary Findings on HBC Development Management Plan (ID/9)

MM6 - addition to proposed allocation of land adjacent to Sandrock Park (SH1)

Representation ID: 9679

Received: 27/03/2015

Representation Summary:

Qualified support: No objection to this modification providing that a sufficient buffer between the new site boundary and St Helen's Wood LWS remains.

Full text:

See attached full submission covering Reps 9675 - 9683 inclusive

Support

Inspector's Preliminary Findings on HBC Development Management Plan (ID/9)

MM8 - deletion of proposed allocation of land at Victoria Avenue (CVO1)

Representation ID: 9680

Received: 27/03/2015

Representation Summary:

We support the deletion of allocation CV01 and its designation as open space for the benefit of people and wildlife.

Full text:

See attached full submission covering Reps 9675 - 9683 inclusive

Support

Inspector's Preliminary Findings on HBC Development Management Plan (ID/9)

MM9 - deletion of proposed allocation of land at Rear of Old London Road (CVO3)

Representation ID: 9681

Received: 27/03/2015

Representation Summary:

We support the deletion of allocation CV03 and its designation as open space for the benefit of people and wildlife.

Full text:

See attached full submission covering Reps 9675 - 9683 inclusive

Comment

Inspector's Preliminary Findings on HBC Development Management Plan (ID/9)

paragraph 15 representations on the Main Modifications

Representation ID: 9682

Received: 27/03/2015

Representation Summary:

We still question whether the Plan achieves a balance between the three mutually dependent dimensions of sustainable development.

In particular we are disappointed to see that four sites that are currently designated for their biodiversity value are still allocated for development in the Plan (LRA1, LRA8, GH3 and FB14). We also cannot support the continued squeeze of Marline Woods SSSI and particularly do not think that allocations LRA6 and LRA9 conform to paragraph 118 of the National Planning Policy Framework.

Full text:

See attached full submission covering Reps 9675 - 9683 inclusive

Comment

Inspector's Preliminary Findings on HBC Development Management Plan (ID/9)

paragraph 15 representations on the Main Modifications

Representation ID: 9683

Received: 27/03/2015

Representation Summary:

We note Sussex Wildlife Trust's suggested wording for policy HN7 has not be considered and that there is only one minor change listed in the Additional Modifications(HBC/30) for the Plan. The Trust does not consider the current policy and Green Infrastructure Strategy to be sufficient. The design briefs found in Appendix A of Development Management Plan are extremely minimal and do not appear to highlight any true enhancements to the Green Infrastructure Network. It is vital that the GI strategy is properly integrated in the plan making process and not simply seen as a tick in the evidence base list.

Full text:

See attached full submission covering Reps 9675 - 9683 inclusive

For instructions on how to use the system and make comments, please see our help guide.