6.23
Object
Hastings Local Development Framework - Core Strategy Informal Consultaton 27 June - 8 August 2011
Representation ID: 1863
Received: 18/07/2011
Object to expansion of SCCH College Station Plaza: It is already cutting staff, so needs less space, not more.
Support
Hastings Local Development Framework - Core Strategy Informal Consultaton 27 June - 8 August 2011
Representation ID: 1938
Received: 08/08/2011
6.23 Sussex Coast College Hastings (SCCH):
With both campuses now open, SCCH urgently requires supportive infrastructure for its 350 staff, 2000 students (full time) and 5000 students (part time).
The College support the Hastings Greenway Project and are currently helping to develop the Greenway Campus Link Project. This new 1.5 km long linear park (located in the rail corridor) will enable the college to operate a sustainable travel plan that allows Campus to Campus walking and cycling. This new link is to be shared with HUB, the local communities and the general public, and is also integrated with public transport.