Further consideration needs to be given to the development of locally owned enterprise in this area as part of this development. Such a large development being serviced by 'a shop' (12.12 below) will be insufficient. The lack of affordable retail and commercial premises in this area for residents who may wish to start their own business is creating a barrier that could hinder the Council delivering on the new 'worklessness' agenda being tackled through the Working Neighbourhoods Fund.
Object
Core Strategy Preferred Approaches
Representation ID: 97
Received: 07/07/2008
The natural environment must be protected and enhanced in this area, with biodiversity gains from development, as required by PPS9 and the NERC Act.
Support
Core Strategy Preferred Approaches
Representation ID: 141
Received: 08/07/2008
The landscape structure plans for Ore Valley Millenium Community establish an important precedent and regeneration template. This strategy should be adopted elsewhere in the neighbourhood. Speckled Wood is a great asset and would benefit by this innovative approach. A partnership based feasibility study should identify the best way to develop Speckled Woods untapped amenity and environmental potential so this unique urban greenspace can play a new and exciting role in the regeneration of the Ore Valley.
Object
Core Strategy Preferred Approaches
Representation ID: 251
Received: 23/07/2008
(12.12) The re-introduction of a stopping service to Ashford is a pre-requisite to any development taking place on this site.
Support
Core Strategy Preferred Approaches
Representation ID: 272
Received: 23/07/2008
12.6 agree
Support
Core Strategy Preferred Approaches
Representation ID: 341
Received: 24/07/2008
no comment
Comment
Core Strategy Preferred Approaches
Representation ID: 381
Received: 24/07/2008
It is essential that this has roads to connect with several others in the area (Malvern Way, Frederick Road, Parker Road), otherwise it will become cut off from local areas.
It needs to have some provision of "community space" that is, a rentable building ( with large and smaller spaces) which local people can use for events.
Comment
Core Strategy Preferred Approaches
Representation ID: 383
Received: 24/07/2008
For both the Ore Valley MC, and eventually the North-West housing area, the Church of England locally (which I head up) is planning to provide a community worker to develop the sense of community in these new-build areas (and connect with existing residents/ facilities). We would be happy to work with others in the planning and realizing of these objectives. One concern I have is how we connect incoming people with those who already live in the area ( especially in the Broomgrove and Farley Bank Estate. )
Support
Core Strategy Preferred Approaches
Representation ID: 493
Received: 23/06/2008
No comment
Comment
Core Strategy Preferred Approaches
Representation ID: 1153
Received: 04/07/2008
Ensure cycle and walking routes in Valley connect to good link to Town centre, especially new college in Town
Support
Core Strategy Preferred Approaches
Representation ID: 1172
Received: 08/07/2008
Ore Valley Millenium Community, strongly support new greenway routes.
Comment
Core Strategy Preferred Approaches
Representation ID: 1187
Received: 04/07/2008
Ore Valley should be linked to all cycle/walking networks from the Greenspace cycle/walking routes.
Comment
Core Strategy Preferred Approaches
Representation ID: 1230
Received: 08/07/2008
To maximise the opportunties generated by the Greenspace cycle & walking routes in the heart of the valley by investing in connections to the rest of the cycling & walking network.
Support
Core Strategy Preferred Approaches
Representation ID: 1322
Received: 14/07/2008
We support the Ore Valley Millennium Community development.
Comment
Core Strategy Preferred Approaches
Representation ID: 1527
Received: 08/07/2008
The Millennium Communities programme was set up by English Partnerships in 1997. The local Regeneration company commenced in 2002. The development has been divided into phases.
a)Lower Road
b)Upper Roads
c)Mount Pleasant Hospital Site
d)Stills Factory
e)Broomgrove Power Station
f)Other phases
g) Hastings College (completion 2009) ?commencement
h)1500m2 health centre
i)greenway
j)Green open spaces
The whole site has been compulsorily purchased. The following need to be included in the LDF
a)appointment of architect
b)commencement & completion of each phase
c)appointment of a Developer
d)Dates for Full Planning Permission for each phase.
Object
Core Strategy Preferred Approaches
Representation ID: 1528
Received: 08/07/2008
The development for 660 homes maximum (ie.500 & 160). The 150 further dwellings as part of this development do not exist. The overall figures for Sea Space application for 10 hectares was 650 dwellings c66 dwellings per hectare. Sea Space have reduced the figures to around 400 dwellings for 10 ha.
12.8 i)Malvern Way ii)Shops on Malvern Way - sold at public auction? Bramwell Estates to develop in 2011
iii)Farley Bank iv) The Cheviots & Cotswold Close - 1066 to develop between 2010 & 2015 - it is unlikely that these sites will be sold at auction like another 1066 site locally.
Object
Core Strategy Preferred Approaches
Representation ID: 1529
Received: 08/07/2008
12.8 The whole area to built to standards required by Ore Valley
12.13 Hastings Millennium Community Urban Design Codes - NOT TRUE
this was waived by Hastings Planning Department & Planning Committee
Comment
Core Strategy Preferred Approaches
Representation ID: 1530
Received: 08/07/2008
12.10 HCAT commencement date? Area of the building
12.12 1500m2 Health Centre - commencement & completion date? Number of doctors, support staff?
Object
Core Strategy Preferred Approaches
Representation ID: 1531
Received: 08/07/2008
The whole section does not address the needs of the area.
Object
Core Strategy Preferred Approaches
Representation ID: 1645
Received: 08/07/2008
The development will not reach 800 homes due to topography, housing market flooded with flats, large amount retail, health centre, road infrastructure and power cables in the area. Baird, Tressell and Old Hastings have some of the highest density areas therefore this space should be used to lower that density by not cramming in properties and improving the housing mix in the area.
Comment
Core Strategy Preferred Approaches
Representation ID: 1646
Received: 08/07/2008
12.2/12.11 there will not be a new PARK as this Greenspace will stay a more informal area without neat flower beds more brambles and bracken; without bunny corner more wildlife heaven; the site is very sloped so would not be open throughout and areas that are not open would not be all disabled friendly, hills is hills, not Stanner Stairlifts installed.
Comment
Core Strategy Preferred Approaches
Representation ID: 1647
Received: 08/07/2008
12.8 1066 Housing Association are looking to auction off the land they hold with planning consent stating July 2008 with Emerson Auctioners.
Comment
Core Strategy Preferred Approaches
Representation ID: 1648
Received: 08/07/2008
12.9 think this standard has been updated in line with new government guidelines (something this document will not allow for and therefore as standards go up the standard of the document will go down)
Comment
Core Strategy Preferred Approaches
Representation ID: 1649
Received: 08/07/2008
12.13 Millennium Communities Urban Design Codes are for a very limited area and should be rolled out across the town