Objective 8

Showing comments and forms 1 to 18 of 18

Support

Core Strategy Preferred Approaches

Representation ID: 25

Received: 21/06/2008

Representation Summary:

We support this objective - as there should be proper cycle routes to all business and housing developments and not just for leisure cycling. However some proposed developments e.g. enviro-enterprise park do not seem to have taken this into account.

Support

Core Strategy Preferred Approaches

Representation ID: 28

Received: 24/06/2008

Representation Summary:

Although I believe that Travel Plans should be required for smaller developments also.
In addition, we have to be realistic and not expect Hastonians to take to their bikes willingly due to the hilly nature and many narrow roads. Public transport should be improved and cleaner forms of public transport explored, rather than busses.

Support

Core Strategy Preferred Approaches

Representation ID: 39

Received: 30/06/2008

Representation Summary:

This objective should be strengthened by reducing the threshold of 10,000m2 gross floorspace to 2,000m2 or developments likely to employ 20 or more people.

Support

Core Strategy Preferred Approaches

Representation ID: 88

Received: 07/07/2008

Representation Summary:

Support, but would like to see this integrated into all development schemes.

Support

Core Strategy Preferred Approaches

Representation ID: 172

Received: 08/07/2008

Representation Summary:

Changing travel behaviour is financially effective and offers environmental and puiblic health benefits. Sustrans requests the LDF provides for implementation of a high quality Borough wide walking and cycling network

Support

Core Strategy Preferred Approaches

Representation ID: 320

Received: 23/07/2008

Representation Summary:

no comment

Support

Core Strategy Preferred Approaches

Representation ID: 450

Received: 23/06/2008

Representation Summary:

No comment

Object

Core Strategy Preferred Approaches

Representation ID: 573

Received: 25/07/2008

Representation Summary:

Objectives 7 & 8, neither of the objectives promote sustainable transport enough within the existing urban areas. There must be a huge investment in a walking and cycling network encouraging a decrease in car use and promoting a healthier lifstyle. This should include the improvement of existing steps, twittens and footpaths that should be made attractive and safe. The extension of the seafront cycle path from Robertson Street to the Old Town should be a priority. The two college sites in central and Ore should be connected by a greenway link that will include the present Balfour Beatty/Network Rail site alongside the railway which will also connect the Town Centre with Alexandra Park for pedestrians and cyclists.

Comment

Core Strategy Preferred Approaches

Representation ID: 1070

Received: 08/07/2008

Representation Summary:

Stagecoach are poor bus providers. The Hastings community Transport scheme should be radically extended with new service routes

Support

Core Strategy Preferred Approaches

Representation ID: 1089

Received: 08/07/2008

Representation Summary:

Stongly support objective 8 - cycling, walking and public transport

Support

Core Strategy Preferred Approaches

Representation ID: 1145

Received: 04/07/2008

Representation Summary:

Plus create cycle links to station to improve integrated transport

Support

Core Strategy Preferred Approaches

Representation ID: 1165

Received: 08/07/2008

Representation Summary:

particularly support objective 8, increased use of cycling and walking.

Support

Core Strategy Preferred Approaches

Representation ID: 1179

Received: 04/07/2008

Representation Summary:

identify & promote sustainable transport - support this

Support

Core Strategy Preferred Approaches

Representation ID: 1223

Received: 08/07/2008

Representation Summary:

i support this objective

Support

Core Strategy Preferred Approaches

Representation ID: 1349

Received: 08/07/2008

Representation Summary:

Support the provision of sustainable transport infrastructure to link proposed development sites with existing development is welcomed.

Support

Core Strategy Preferred Approaches

Representation ID: 1409

Received: 08/07/2008

Representation Summary:

We support the promotion of sustainable alternatives to travelling by car including improved cycle & public transport routes.

Comment

Core Strategy Preferred Approaches

Representation ID: 1410

Received: 08/07/2008

Representation Summary:

Deficiencies in public rights of way networks should be identified & opportunities to develop routes for walking & cycling which link with public transport & access to the countryside maximised.

Comment

Core Strategy Preferred Approaches

Representation ID: 1636

Received: 08/07/2008

Representation Summary:

Critical success factors - Many of these seem to stray into the teritory of policy or proposals which could be seen as prejudicing aspects of the strategy.