Comment

Inspector's Preliminary Findings on HBC Development Management Plan (ID/9)

Representation ID: 9713

Received: 20/03/2015

Representation Summary:

I do not understand why the document I have presented with the four copies as requested and as a consequence I do not see any mention of the very serious flood issues that I covered. Please l am due a full correct answer since I wrote the document I have found further complications, one being ground water problems generated by the Link Road and the new proposed Link between the Link Road and the A21.

Full text:

See attached full submission covering Reps 9704 - 9714 inclusive