Object

Hastings Development Management Plan Proposed Submission Version

Representation ID: 5505

Received: 12/04/2013

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Object to development of Robsack A (GH1) which does not I believe conform to policy HN9 or UR8 Sustainability Appraisal p171/172 referring to 'greenfield nature' of site.
It is not possible to develop this site without harm to habitats, natural environment, protected species and detriment to adjoining woodland (Church Wood).

Full text:

Object to development of Robsack A (GH1) which does not I believe conform to policy HN9 or UR8 Sustainability Appraisal p171/172 referring to 'greenfield nature' of site.
It is not possible to develop this site without harm to habitats, natural environment, protected species and detriment to adjoining woodland (Church Wood).
The Development management Plan is clearly being flouted by inclusion of Robsack A in sites for development the overall conclusion reached in para 6.65 site allocation p87 is not factual and unrealistic taking into account the description.
Land adjacent to Sandrock Park should be deferred for development until the second part of the Local Plan period so as to evaluatie the effect on traffic on The Ridge of the creation of the Bexhill/Hastings Link Road.